current packaging metho

The first step in strengthening unit control is to understand these benefits. So, when is the best time to test the packaging method? Any time is the simple answer: there are several parts, one is after the failure of the product, the second is in the packaging redesign, in order to meet the requirements of customers, we want before product release, we should try to be active to test your packaging design. Ideally, we’d better test it and do it sooner rather than later, and then suggest it in the packaging design phase.

There are lots of ways to do this. Here are three different ways and services

1 application for review, this is what customer service does: the current packaging method needs to be evaluated, and then a comprehensive analysis report and recommendation report is also required to be completed. Whether it is for the purpose of upgrading the packaging system for a new product or to determine further savings, this 1-3 day review can help.

  1. Site engineering: work required at the service site. It includes two parts, the first is to develop new packages, and the other is to support the provision of existing projects. This package is also allowed and accepted throughout the supply chain environment.

3, packaging lab test: in a variety of equipment IS certification in a controlled environment for product testing, in order to achieve the goal of their own, such as in a variety of poor handling and transportation conditions can also ensure that packaging solutions can withstand the pressure.

Lab tests are the most common in all services, because it is characterized by effectiveness and efficiency. The proposed unit control solution will work in the real world and help to prove it. For more complex products or early stage products, site testing is highly recommended. Based on past experience, for packaging engineers in our lab, the test a unit probably took an average of 40 hours of engineering work, according to the product condition and the change of test parameters, when the time line will be along with the change.